*  
Pictorial progress of Timber Valley MRR. Project started 7/15/2007.
P1000006

A wall was removed to make 2 rooms into 1

P1000007

Looking away from mechanical room

P1000008

Cabinet builder

P1000242

Down the isle to the mechanical room

P1000244

View from the isle

P1000246

Down the hall to the passenger station

P1000247

My helper in the city area - fall 2008

frm_to_trm

Looking in from family Rm

P1000305

Rollout section for machanical room access. Proposed area for 3 bridges.

P1000415

Proposed bridge area with temporary support for test track.

P1000306

Backdrop and building size

cutout_buildings

Experimenting with cutout buildings with "blue shirt" for sky

cutout_buildings2

Cutout buildings in front of painted panel with high smog.

P1000551

Proposed city location with some cut outs

P1000554

Painted backdrop

P1000552

Painted backdrop

P1000553

Proposed station location

P1000660

Background buildings

P1000673

Creating Marilyn city

P1000698

Steel Mill area 3/7/12

P1000699

Engine terminal 3/7/12

tv_power_drawer

Main power located in drawer

steel_mill2.JPG

Steel Mill area 12/13/14